EDC & Regions: List of Projects and Inclusion Criteria

Appendix on EDC projects mapped by AFEN in our report France The Strength of Regions at the Heart of the EDC.

EDC Projects

Auvergne-Rhône-Alpes

  • 1. Alpinex — Val d’Isère (Direct Air Capture)
  • 2. Vicat (VAIA) — Montalieu-Vercieu (CO₂ capture from the cement plant in Isère, 20% of biogenic CO₂)
  • 3. Carbon8 and Vicat — Montalieu-Vercieu (Mineralization of industrial ash)
  • 4. ClimeRocks — Saint-Flour, Cantal (ERW)

Burgundy-Franche-Comté

  • 5. Bordet Group — Decize (Biochar)
  • 6. Bordet–Leuglay Group (Biochar)

Brittany

  • 7. Carbonway — Rennes (Mineralization)

Centre-Val de Loire

  • 8. TerraWatt — Marmagne (Biochar)

Grand Est

  • 9. Carbon Impact × Meurthenergie — Azerailles (BECCS)
  • 10. Carbon Impact × Mortagne Environnement — Gerbéviller (BECCS)
  • 11. Carbon Impact × Seille Environnement — Haraucourt-sur-Seille (BECCS)
  • 12. NéoStock — Nancy (Geological Storage)
  • 13. Soler Group — Gyé-sur-Seine (Biochar) First site since 2012
  • 14. Soler Group — Gyé-sur-Seine (Biochar) Second biorefinery
  • 15. Neustark × Fehr — Bischwiller (Mineralization)
  • 16. Neustark × Lingenheld — Oberschaeffolsheim (Mineralization)

Hauts-de-France

  • 17. Revcoo BOCAHUT (Eiffage site) — Avesnes-sur-Helpe (CO₂ capture from industrial emissions /
    (biogenic CO₂ potential)
  • 18. Idex & Nuada at the Kogeban Biomass Power Plant (BECCS)

Île-de-France

  • 19. C-Questra — Grandpuits (Geological Storage)
  • 20. Neustark × Lafarge — Gennevilliers (Mineralization)
  • 21. Yama Carbon — Drancy (Direct Air Capture)

Normandy

  • 22. Terra Fertilis — Argentan (Biochar)

New Aquitaine

  • 23. Miraïa — Garlin (Biochar)
  • 24. Soler Group — Lacanau (Biochar)
  • 25. Terega – Projects to be confirmed in 2026 (BECCS)

Occitanie

  • 26. Miraïa — Colomiers (Biochar)
  • 27. SICTOM Pézenas-Agde — Hérault (Biochar) – Biochar production facility announced for 2026

Pays de la Loire

  • 28. Carborok × Nexstone (Colas) — Chauvé (Mineralization)

Inclusion criteria

A project is designated as an “EDC project” if it meets the following three conditions:

  1. Establishing a foothold in France : project concrete (announced / pilot / operational) locatable within France (mainland France, including Corsica).
  2. EDC Intention : removal of CO₂ from the atmosphere and claimed long-term storage, based on a verifiable source (official website, press release, public documents).
  3. Scope of Technology : only engineered / semi-engineered :
    • Biochar / BiCRS (sustainable carbon storage using biochar)
    • BECCS / Bio-based CO₂ Capture and Storage
    • Mineralization
    • Accelerated weathering (ERW)
    • DAC (Direct Air Capture)
    • Geological storage

Exclusions (explicit) :

  • Organizations without a traceable project in mainland France (e.g., R&D without a French location, or localized international deployment).
  • Projects CO₂ capture at the source (industry) or CCUS aimed solely at decarbonization, without EDC intent (no withdrawal mechanism and no long-term storage associated with withdrawal).
  • Projects natural wells and projects “Low-Carbon Label” (LBC) are not included at this stage, as they fall under a different scope that is already well established in the region, with many more active projects than EDC’s technological and semi-technological solutions.

Related news

A Framework for Action: The AFEN Code of Ethics and Its Four Pillars

European carbon-free associations join forces

The State of Carbon Dioxide Removal, 3rd edition: key figures and what they mean for France